Skip To Main Content

VIS Lead Testing Results

Summary of Samples Collected at Victor Intermediate School:

 Building Name

Date of Sampling

Total

Samples

At or Below Action Level*

Above  Action Level* 

 

 

 

 

 

Victor Intermediate

June 2, 2025

165

117

48

 

 

 

 

 

*NYS Action Level is 5 parts per billion

Listing of Outlets Requiring Remediation

The following outlets were analyzed above the NYS Action Level:

 

Sample #

Location

Fixture/Outlet type

Laboratory

Analysis 

(in ppb)

203.2-01

Receiving 143 Unisex Rest Room

Sink

5.6

203.2-10

Kitchen 3 Bay Right

Sink

10.1

203.2-11

Kitchen 3 Bay Left

Sink

8.5

203.2-14

Snack Bar 146

Sink

10.6

203.2-18

Fac Women by 195 left

Sink

5.0

203.2-19

Unisex in 195

Sink

485

203.2-20

PPS Office Fac Lav Left

Sink

8.1

203.2-21

PPS Office Fac Lav Right

Sink

9.3

203.2-22

Room 160 Lav

Sink

155

203.2-34

Music Room 193

Sink

18.9

203.2-56

Girls Lav Outside 116A C

Sink

9.1

203.2-57

Girls Lav outside 116a R

Sink

6.1

203.2-62

Room 184

Sink

7.3

203.2-63

Room 183

Sink

6.0

203.2-107

DF by Elevator

Drinking Fountain

5.2

203.2-108

Room 134

Sink

9.5

203.2-110

Room 135

Sink

16.3

203.2-111

Room 136

Sink

21.9

203.2-112

Room 137

Sink

18.7

203.2-113

Boys Lav by Lib L

Sink

5.2

203.2-115

Boys Lav by Lib RC

Sink

11.6

203.2-116

Boys Lav by Lib R

Sink

149

203.2-119

Girls Lav by Lib L

Sink

12.1

203.2-121

Girls Lav by Lib RC

Sink

8.7

203.2-124

Room 213

Sink

10.3

203.2-125

Room 212

Sink

6.7

203.2-126

Room 214

Sink

13.5

203.2-127

Room 211

Sink

6.8

203.2-128

Room 215

Sink

7.7

203.2-129

Room 210

Sink

8.2

203.2-131

Room 209

Sink

8.0

203.2-132

Room 208

Sink

6.7

203.2-133

Room 217

Sink

8.3

203.2-136

Boys Lav Across 207 RC

Sink

6.4

203.2-140

Room 207

Sink

13.3

203.2-147

Room 219 Handwash sink L

Sink

10.5

203.2-148

Room 221 handwash sink L

Sink

10.8

203.2-149

Room 206

Sink

12.2

203.2-15

Aide Room 149 inside room 148

Sink

7.5

203.2-150

Room 205

Sink

13.1

203.2-151

Room 223

Sink

15.0

203.2-154

Room 204

Sink

11.4

203.2-155

Room 203

Sink

13.0

203.2-156

Room 227

Sink

26.5

203.2-157

Room 202 Far Door L

Sink

14.4

203.2-159

Room 202 Near Door L

Sink

8.8

203.2-160

Room 202 Near Door R

Sink

10.3

203.2-161

DF Outside 227

Drinking Fountain

5.5